Platform / HR & Field Operations
Platform module · Field ops

Dispatch, install, procure — from one audited queue

Technicians, installation tickets and procurement for fiber and hotspot networks — every job assigned, tracked and signed off, across dedicated hr, tech and procure panels.

wanfiber · field-ops — today
$ mycellium dispatch list --today
#inst-1042  FTTH drop · Kileleshwa  done 09:40
#inst-1043  ONU swap · Westlands    done 11:15
#inst-1044  in progress · J. Otieno on site
#inst-1045  queued · slot 14:00–16:00
#proc-0087  24× ONU + 2× OLT — awaiting approval
Technician dispatch

The right tech on the right job, provably

  • Installation tickets, not WhatsApp threads. New connections, ONU swaps and fault visits become tickets with slots, addresses and subscribers attached.
  • Dispatched to a named technician. Every job has one owner — visible on the tech panel the moment it's assigned.
  • NOC incidents land here too. A confirmed outage dispatches field work from the same queue, not a side channel.
  • Proof of work. Time on site, resolution notes and sign-off are recorded before a ticket can close.
ticket · #inst-1044
subscriber: A. Wanjiru · 50 Mbps FTTH
job: new installation · ONU + router
assigned: J. Otieno · slot 13:00–15:00
 
13:07 on site · 13:52 ONU rx -20.1 dBm
14:10 speedtest 52/48 Mbps · subscriber signed
14:11 ✓ closed · audit row written
Procurement & audit

Stock that matches the work orders

  • A procurement queue, not a spreadsheet. ONUs, OLTs, fibre and CPE requested, approved and received in one flow.
  • Dedicated panels per role. hr for people, tech for field work, procure for purchasing — each scoped to what that role needs.
  • Full audit trail. Every assignment, approval and status change is logged with actor and timestamp.
  • Feature-gated by plan. Panels you haven't enabled simply don't appear — no clutter, no dead ends.
hr panel tech panel procure panel audit log
audit-trail · procure
09:12:04 hr@wanfiber created request #proc-0087
09:12:04 items: 24× ONU, 2× OLT MA5800
10:31:47 finance@wanfiber approved budget
10:31:48 status → ordered · supplier notified
receiving will reconcile against installations
 
every step attributed · timestamped · exportable
Run a tighter crew

Every job accounted for. Every shilling too.

Start a pilot and put your dispatch, installations and procurement on panels your team will actually use.